Monday, June 20, 2011

weekend progress

The insulation panels are done, front door panels installed, sub-carpet mat installed on top of new reflectix layer for foot-wells, glove box adjusted, window seals thoroughly cleaned, polished bumpers, and tightened up door latch handles.

The pvc water/grey tank idea is on hold due to the high cost of the pvc. Looking into alternatives, perhaps the plastic jerry cans would do, need to get measurements from underneath the van.
Researching RV toilets.

Fridge mods are still not done, need to go to radioshack to get fans and switches.
Still waiting for the body panels and window covers to arrive.

Need tires too, usual tire places were utterly useless.